Break Water Masterplan

“Breakwater” is a 100-hectare new master planned community located in the Merrimac Floodplain which will be strategically located within the existing urban footprint, close to existing rail, road and bus infrastructure as well as recreation, sporting, education and health facilities.

Burchills are engaged by Walker Corporation to deliver engineering and environmental strategy, planning and design for this significant development. The site will ultimately be home to over 1,500 residential, retail and commercial dwellings. The site is close to existing rail, road and bus infrastructure as well as recreation, sporting, education and health facilities. The masterplan will incorporate two new road and pedestrian connections over adjoining state land linking the existing Robina and Merrimac communities. The development is situated on the Merrimac Floodplain with multiple sensitive receptors in the nearby area, flood constraints are a significant challenge and opportunity for this development.

Burchills are responsible for:

  • Trunk civil infrastructure;
  • Flood and Stormwater management; Water sensitive urban design;
  • Erosion and sediment control;
  • Lake management;
  • Traffic and transport planning; and Environment Assessments.

Some of the key elements of Burchills scope include:

  • Master planning for flood storage balance areas and stormwater management for the development;
  • Drainage design for the development including stormwater management/treatment areas; and
  • Bridge and trunk road upgrades and planning.