Burchills were engaged by Reece Milburn to complete a regional flood study of the Proserpine River catchment. The purpose of the study was to determine a defined 1% AEP flood level for a proposed development near the town of Proserpine. The project consisted of developing detailed hydrological and hydraulic modelling in URBS and TUFLOW.
