Burchills were engaged by Walker Corporation to deliver the Civil Engineering for a major development. The development included large-scale industrial allotments, industrial collector roads for B-double vehicles, trunk services infrastructure and vehicular bridge over existing railway.
Burchills was responsible for:
- Trunk civil infrastructure assessment and planning
- All civil works including bulk earthworks in excess of 970,000 cubic metres in the first 2 stages;
- Overall water supply and sewerage planning reports and schematics;
- Major regional drainage works;
- Flood storage assessments;
- Trunk industrial collector roads;
- Large-span vehicular bridge over railway, using “Super-T” girders;
- Major QDMR Intersection with Brisbane Road, including design for B-Double vehicles;
- Large regional sewer pump station. (4m dia. well);
- Assistance with master planning and major traffic routes analysis for overall development; and
Incorporation of on-road ‘rain-gardens’ and end of line bio-retention treatment devices within the stormwater drainage system.
